Tuesday, July 3, 2018

Ready For Track Laying

Since the St-Pie layout is a summer building effort, we have to make decent steps forward to ensure the project move along. One such step was gluing down cork sheet on the plywood to create a suitable roadbed for track laying.

In real life, terrain in St-Pie is extremely flat, so we decided to install the cork all over the place. Small variations in topography will be done later by using some putty or universal mud or anything suitable.

Cork and new light fixtures.

This step is also important because from now, Jérôme can work by himself at his own pace. He's our master track layer on the club layout and I certainly expect he will do a good job.

Interestingly enough, Jérôme wants to nail down the track instead of gluing it. He has often advocated for this in the past. Nailing track is no longer considered "professional" nowadays with everybody gluing the track down. While it is debatable, his opinion is you should never permanently glue your tracks before having operated the layout for a while to trouble shoot your work and see if the planned design is really up to the task. It may be a matter of moving a turnout one inch or two to get better results or simply realign a siding a little bit for clearance. Once everything has been worked out, you can glue and ballast the track... or simply keep the nails there if it doesn't bother you that much.


I'm most admit I'm pretty curious to see how operating such a minimalist layout will turn out. We really went on a limb with this one and I hope it can project long lasting interest for an operator.

No comments:

Post a Comment